Production Status

We proudly offer high quality, custom built-to-order faucets, not mass produced. With 28 spout and handle options, and over 25 finishes, there are over 2 million unique design options for widespread faucets alone. This unique flexibility allows virtually unlimited design choices. However, this may sometimes make estimated lead times longer and less accurate than mass-produced products.

Therefore, please note all lead times are estimates. While we usually ship faster than the estimated lead times, occasionally an unforeseen circumstance causes a lead time to be exceeded.

Updated 3/25/24

We deeply thank you and are humbled by the wonderful reaction we’re receiving to our new product and catalog launch.

Due to the tremendous surge in orders, we anticipate a temporary delay in our estimated lead times of 1-2 weeks for all finishes. We believe this may continue for the next month or so as we increase production to meet the demand spike. The lead times should then return to normal.

Please see the up to date estimated lead times below.


Current Estimated Lead Times

Most Popular Finishes

PC- Polished Chrome - 1 to 2 weeks

SN- Satin Nickel 2 to 3 weeks

PN- Polished Nickel (PVD) – 2 to 3 weeks

MBLK- Matte Black 2 to 3 weeks

SB- Satin Brass (PVD) – 3 to 5 weeks

BBU- Burnished Brass Uncoated – 2 to 3 weeks

Moderate

Extended


ABF-Antique Brass Flat 2 to 3 weeks

ACF- Antique Copper Flat 3 to 5 weeks

ANF- Antique Nickel Flat 3 to 5 weeks

BBU- Burnished Brass Uncoated - 2 to 3 weeks

BLK- Black 2 to 3 weeks

BNU- Burnished Nickel Uncoated 2 to 3 weeks

BTB- Bella Terra Bronze 2 to 3 weeks

MBLK- Matte Black 2 to 3 weeks

MWHT- Matte White 2 to 3 weeks

ORB- Oil Rubbed Bronze – 2 to 3 weeks

PBU- Polished Brass Uncoated – 2 to 3 weeks

PC- Polished Chrome – 1- 2 weeks

PN- Polished Nickel (PVD) – 2 to 3 weeks

SB- Satin Brass (PVD) – 3 to 5 weeks

SC- Satin Chrome (PVD) 3 to 5 weeks

SN- Satin Nickel 2 to 3 weeks

WHT- White 2 to 3 weeks

USS- Ultra Stainless Steel (PVD) 3 to 5 weeks




BLKN- Black Nickel (PVD) 10 to 12 weeks

CB- Carbon (PVD) – 10 to 12 weeks

FRG- French Gold (PVD) – 5 to 7 weeks

GRP- Graphite (PVD) – 10 to 12 weeks

LPG- Lifetime Polished Gold (PVD) – 5 to 7 weeks

LSG- Lifetime Satin Gold (PVD) – 8 to 10 weeks

PB- Polished Brass (PVD) – 5 to 7 weeks

SBZ- Satin Bronze (PVD) – 8 to 10 weeks